Installation Precautions of Plastic Mold

Injection molding is a batch processing method used when some parts of complex shape. It refers to the specific heat to melt the material injected into the mold cavity by the high pressure, after cooled and solidified to obtain a molded product. It is a tool for the production of plastic products; plastic products also impart structural integrity and precise dimensions of the tool. At the time of installation, we need the following.


1. Pre-screening: Before the injection molding machine will be installed, the need for appropriate inspection, to facilitate the timely detection of problems and timely repair to prevent but also removed after installed. If the fixed template mold and move apart when the template inspection, pay attention to make the direction of the mark, to avoid a mistake when clamped.


2. The installation Bevel die: during loading mode, with two people to be close, if there is one side of the parting mechanism should be installed in a horizontal position slider.


3. Fastening mold: When positioning seat positioning ring into the injection molding machine, with its slow speed mold closing process, the use of the movable platen mold clamping, and the hold-down plate, and compression plate to install pad tablets, the hold-down plate shall be mounted on the need to up and down the four pads.


4. Adjust the distance from the top mast: After tightening, etc., so that it slowly start mode, until the movable platen Stop Rewind, ejector position should be adjusted to the top of the mold between the plate and the movable platen leave of not less than 5 mm gap the location, to avoid damage to the mold.


5. Adjust the tightness of the closed mold: To avoid overflow edge problems, ensure there is adequate exhaust cavity, we note in the regulation of the hydraulic piston, pay with visual and experience, that is, when the closed mold, toggle to soon after the first slow order straight, the tightness of the closed mold just fit. If the required mold temperature of the mold, the mold temperature should be raised, and then adjust the tightness of the closed mold.


6. Connected to the cooling water: such as mold in place and, after debugging, the cooling water is turned on at the same time to check the inside is smooth, not leaking the phenomenon, in order to ensure the normal application.


Leave Message

If you have any problems or questions about our products or need our support and assistance, please feel free to write us, we will reply to you within 24 hours, and never reveal your information to the third party. Thank you!

Subscribe to Updates

Subscribe to get latest news.

Capacity

Our company has 523 sets of various precision processing machine tools and advanced inspection and testing equipment; and produces 12,000 sets of various construction machinery annually.

Contact Us

Headquarters: Dazhuang Economic Development Zone, Yinan, Shandong, P.R. China Telephone:+8613663816343

Contact Us| Site Map